I am running OME 1.3 and I have a discovery job that runs on Saturday and Sunday at 1300. The job finishes at 1347 give or take a minute whether it has discovered the entire range or not. Is there a way to tell it to continue until it has scanned everything? There is no other job scheduled to run after the discovery so I do not understand why it stops at this time.
↧